Jurong Aromatics (McConnell Dowell)

21
Jun

Jurong Aromatics (McConnell Dowell)

[caption id="attachment_1813" align="alignleft" width="960"] Jurong Aromatics Plant Overview[/caption] [caption id="attachment_1815" align="alignleft" width="600"] Jurong Aromatics in Evening[/caption] [caption id="attachment_1816" align="alignleft" width="900"] Jurong Aromatics in Operational[/caption]

Read more →
12
Jun

13 Topside Process Modules Of FPSO Cidade De Itajai

PROJECT DATASHEET Location:                                               Brazil Field Operator                                     Petrobras Vessel Operator                                   Teekay Corp Oil Production Capacity                    80,000 bbl/d Produced Water Capacity                 76,000 bwpd Gas Compression Capacity               76 mmscfd Storage Capacity                                 650,000 bbl Wasco Singapore supplied Units: Water Injection Pump, Seawater Injection, Water Treatment, Gas Dehydration, Crude Oil Separator "A", Compressor (3 Units), Process Train "B" + Booster Compressor, Manifold, Subea Chemical Utility CMS Asia Singapore as software vendor to support Construction, Mechanical Completion and…

Read more →
05
Jun

FPSO Cidade de Itajai

  [caption id="attachment_1533" align="aligncenter" width="300"] Construction and Integration Works.[/caption] [caption id="attachment_1531" align="aligncenter" width="300"] Floating and Inclining Test[/caption] [caption id="attachment_1652" align="aligncenter" width="300"] FPSO Production Start[/caption] Tanker conversion and refurbishment in Jurong Shipyard for PetroProd Singapore and Jurong Shipyard.  Construction and installation of modules by Wasco Energy Group. Vessel Information: FPSO CIDADE DE ITAJAI

Read more →