PRE-COMMISSIONING

Pre-Commissioning (PC)

Pre-Functional Checklists, adjustments, calibrations, devices and tests shall be made by Contractor and Vendors as required by governing codes, regulations, manufacturer’s recommendations and verify correct assembly and installation of equipment and systems.